Author name: James Robertson

Omega 3.50” V-Zero™ Retrievable Bridge Plug recovered to the surface after 25 months in the well.

CASE STUDY – APRIL 2022 Our Omega 3.50” V-Zero™ Retrievable Bridge Plug was successfully recovered to the surface after 25 months in the Well, assisted by Welltec’s Tractor and Stroker Tool (Set in 78° Deviation). Operator Challenge: This short-term suspension had to be extended due to Covid and other planning issues. The extended time that

Omega 3.50” V-Zero™ Retrievable Bridge Plug recovered to the surface after 25 months in the well. Read More »

Introducing New Slimline Retrievable Bridge Plug.

Due to customer demand, Omega has introduced a new slimline 4.50in (3.42in OD) Retrievable Bridge Plug. The need for slimline equipment is becoming a greater requirement in the industry. Our 3.42in version provides the same sealing capabilities as its big brother (3.60in OD) from 11.6# to 15.1# with the same pressure range of 5,000 Psi

Introducing New Slimline Retrievable Bridge Plug. Read More »

Well Intervention Case Study: Fully functional High Expansion Gauge Hanger following recovery after 7 years in Operator Well

An Omega Well Intervention 2” High Expansion Gauge Hanger (HEGH), complete with 4.5’’ Tubing conversion kit and a third party’s Pressure and Temperature sampling Gauge was installed in a North Sea Operator’s well on the 22nd September 2014. The HEGH was deployed from a Light Well Intervention Vessel (LWIV) and was set in the well

Well Intervention Case Study: Fully functional High Expansion Gauge Hanger following recovery after 7 years in Operator Well Read More »

Well Intervention Case Study: Deployment of High Expansion Gauge Hanger to Anchor Foreign Object in Operator Well

Omega Well Intervention provided a tailored oil well intervention solution to a UK Operator in January 2021, utilising our innovative High Expansion Gauge Hanger. Used as an anchor to prevent unwanted movement of objects in flowing wells, the tool was perfect for a problem that had presented itself to the Operator. The Operator’s Challenge: A

Well Intervention Case Study: Deployment of High Expansion Gauge Hanger to Anchor Foreign Object in Operator Well Read More »

Scroll to Top